EC Iława (Heat and Power Plant) - 2015-2016

Design, delivery and commissioning of automation and control system for the turbine TWIN AFA46 3,4 MW. The order included the design and delivery of electronic governor TURBOSTER® SI, 6.3kV switchgear, generator protection system, synchronization system and excitation system.




«return